THE RESEARCH OF PRODUCTION PLANNING OF INTEGRATED
MANAGEMENT IN STEELMAKINGHOT ROLLING
SUN FuquanZHENG BinglinCUI JianjiangWANG Dingwei
(Department of System Engineering of Northeastern University, Shengyan 110006)
LIU Xinsheng
(Fushun Special Steel Co.Ltd, Fushun113001)
AbstractThis paper studies the production planning of integrated management according to the situation of Fushun works. To resolve the matching problems among batches, a new hybrid algorithm based on fuzzy expert system and operation research models is adopted. Furthermore, to resolve the coordination and the matching problems between processes, heuristic rules from the operator's experiment and skills are applied, a criterion function designed by the fuzzy expert system is used, and the B&B and Hungarian methods are also employed. The running result of the system shows that it is excellent in improving the temperature of the input furnace and decreasing the loss of energy and reducing the stock of WIP.
Key wordsProduction planning of integrated management, fuzzy expert system, branch-and-bound.
1
ڸҵûĶ߼Ʒ֡С̽ڵĿǰ.ĴűڵĹɴģӻ֯ѳΪҵߵһش.ҵƻһģŻ1ݣNPȫ.ǶLPDPESʽʵʱԻ.ڽʵʱЩԼģֱѧʽ.ף2ƪϸ⣬ORAIĽԼչ򣬲ֵ̽.Ĳģרϵͳ(FES)ͷ֦編ϵ»㷨һ廯ƻ.
2պ
2.1¹ͼ
ͼ1ʾ


ͼ1¹
(CCRCold Charge Rolling,HCRHot Charge Rolling)

2.2һ廯ƻ
ƣ֮£ѶĿ꺯ͬʱŻмƻ.ƻƵͼ2ʾ.


ͼ2ֳƻ
ļƻƴӺͬӦķƿʼƵģʽװΪʹHCRЧﵽ.ΰһڵͬΪΡ¯ελҲǽΡ¯¯ʵƥĹؼ.ظ˵ƷҪϸС鲢ͬһԵĸ֣Ϊһ¯εҲУڱϵͳ´
1)ֵĺϲͬУѡɷڵĺͬɽͬһ淶ĸֺϲһ¯
2)ֲͬͬĺϲɵܣͬһڸֻܵĸֽй鲢ѹͬĸ㼯Ϊͬһ¯.
Ϊһ廯ƻϵͳܣͨԼ.
1)̶
(i)
(1)
ʽWiΪù񼯵ĺͬiΪͬƷֱλΪmmABCΪ123Ʒ񼯺ϣm1m2m3Ϊ123Ʒ񼯺ޣm4Ϊ.
(ii)ʱԼ
bj-qj-TjLj>0.(2)
2)ģԼ
רҾ鼼ɣ
ifƷthenǿᣬ
ifڲthen᣻
Ŀ꺯
תʱС
(3)
ӳС
(4)
˵
iͬ (i=1I)j(j=1J)bjjĿʼԤʱ䣻qjjĽʼԤʱ䣻Tjjʱ䣻LjjĽСڣTNiͬĽڣTSiͬ.
3ⷽ
3.1ģ
ƻож꣬رǶڸ֡ȶƻо϶࣬ǣһ廯ƻĺЭ֮Ķƻ.о֮Эƻ.
һԣɶ¶Э.
1)ε
ۺЧ⣬Ҫһ(֡豸)һ(豸)ĸ.ͨ¹򸺺ɾЭ.
2)κЭ
ݺͬݱƽκκ󣬱Щκ.ۺʱĸɾ(balance)ͬڡƷֵ.
3.2ϵͳṹ
ϵͳṹͼ3ʾ.
3.2.2ⷨ
step 1.ͬݵķ飬Ʒ֡Ӳȡɷ֡.


ͼ3ϵͳṹ
Step 2.κЭ
1)ȼ

f1=a1*(Ŀ)
b1*(ڶ)   (5)
a1b1ΪȨأ


ͼ5κƥʾͼ
2)ȼԸ
3)Сӳٶȡʡ״ ͨif-thenȷͼ4ʾ


ͼ4FFSȷ
4)ڸ״ȷȣ
5)ΪЧʾŷ⣬Ȼʹ÷֦編ֵջýκεƥ(ABCD)ͼ5ʾ.
Step 3.ȷķΧ
1)ֵȷȼ豸A¼䴦ĿTaľʽΪ
Ta=ha*ka,(6)
ʽhaΪ豸A¼ҵʱ䣬ka豸Aҵʣ
2)ȷͬĲɱСΪĿ꣬滮ģͣȷͬ
step 4.ƻֲ
ڲͬƷ֡Ҫ¹ѵճ̼ƻڴͬļƻ.
Step 5.γƻ.
4 
ĲģרϵͳϢʹ÷֦編ݣ㽽κεƥ⣬ӶϵͳЧԺ.ϵͳģרϵͳ(FES)Ŵ㷨(GA)ϵ·ͬɻЧ.
ƻʱ䣬װ¯¶ȣʡܺģɱ.ĳ460ͬΪ㣬ӳٱʴ24.8%͵3.4%ﵽƽ⣬ʹظֵĸߵһˮƽΪҵÿ¿ɽʡܺʽԪƷгע˻.
Ҿ幥(95-524-02-05)͹Ȼѧ.
︣Ȩ1964.ΪѧϢѧ빤ѧԺϵͳϵʿ.оΪһ廯ƻȵ뷽ұƻеģӦáרϵͳ˹ܵӦ.
֣ء1940. 1964 ҵڶѧԺԶϵ.ΪѧϢѧ빤ѧԺڣоΪսһ廯ϵͳƻۼרϵͳ.
޽1964.ΪѧϢѧ빤ѧԺʿҪоΪӦáϵͳģ.
︣ȨѧϢѧԺ110006E-mail:zbling@pub.sy.ln.cn
֣أѧϢѧԺ110006
޽ѧϢѧԺ110006
ΰѧϢѧԺ110006
ʤ˳޹˾˳113001
ο
1ݡľ. Ϥʻȥ-½ⷨȤζ.Ʋ199534(5):340346
2ݡBuxey G. Production scheduling: practice and theory.EJOR198939(1)1731
3ݡ÷룬Ҳ .֡Ӽͬڻ-󥰥ƥ. Ƹֱ199646(2):3639
4ݡ.-ȥƥƻںϤˤʻ.˹֪ѧ־19938(3)
5ݡٸһ.Ƹ֡ѹһ᥹-󥰥ƥˤĤ. IE199129(4)5456
6ݡ.ڱ̵Ĺ̷.199833(1):19
ոڡ1998-06-05